Supply Date24 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity38.24
Freight27.72
Loading Charges1.237
Offloading Charges-24.99686192
Royalty7.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6218.21
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.2
Fe4.1
SiO213.6
Al2O33.61
P0.12
Size 0-10MM3.1
Size 10-20MM1.66
Size 20-100MM18.
Size +100MM77.14
MOISTURE0.81