Supply Date24 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity51.16
Freight29.237
Loading Charges1.237
Offloading Charges-25.0039093
Royalty7.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost8396.38
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.50
Fe3.10
SiO216.70
Al2O34.17
P0.110
Size 0-10MM1.61
Size 10-20MM2.20
Size 20-100MM18.10
Size +100MM78.09
MOISTURE0.51