Supply Date24 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity26.26
Freight350
Loading Charges-260
Offloading Charges0
Royalty110.72
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost3100.85
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.10
Fe2.89
SiO213.20
Al2O34.03
P0.138
Size 0-10MM2.10
Size 10-20MM1.61
Size 20-100MM60.79
Size +100MM35.50
MOISTURE0.96