Supply Date21 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity29.3
Freight29.726
Loading Charges1.237
Offloading Charges-25.00307167
Royalty7.94
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4831.57
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.50
Fe2.10
SiO213.20
Al2O33.90
P0.110
Size 0-10MM2.15
Size 10-20MM2.96
Size 20-100MM74.97
Size +100MM20.10
MOISTURE0.75