Supply Date21 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity27.36
Freight29.237
Loading Charges1.237
Offloading Charges-25.00402047
Royalty7.94
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4498.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.42
Fe2.59
SiO214.20
Al2O33.37
P0.122
Size 0-10MM2.66
Size 10-20MM3.81
Size 20-100MM27.93
Size +100MM65.6
MOISTURE0.62