Supply Date21 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity42.48
Freight27.72
Loading Charges-25.2069209
Offloading Charges1.237
Royalty7.94
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6911.07
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.90
Fe2.80
SiO214.50
Al2O34.10
P0.108
Size 0-10MM4.50
Size 10-20MM2.90
Size 20-100MM22.50
Size +100MM70.10
MOISTURE0.66