Supply Date20 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity46.66
Freight29.726
Loading Charges1.237
Offloading Charges-21.00300043
Royalty7.44
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7670.9
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.72
Fe3.15
SiO213.25
Al2O33.94
P0.117
Size 0-10MM1.187
Size 10-20MM2.05
Size 20-100MM19.20
Size +100MM76.88
MOISTURE1.12