Supply Date19 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity24.34
Freight350
Loading Charges-260
Offloading Charges0
Royalty94.16
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost2849.3
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.24
Fe3.58
SiO213.74
Al2O33.95
P0.138
Size 0-10MM0.94
Size 10-20MM1.05
Size 20-100MM63.82
Size +100MM34.19
MOISTURE1.15