Supply Date19 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity33.54
Freight650
Loading Charges-260
Offloading Charges0
Royalty94.16
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost4546.09
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.20
Fe4.02
SiO218.48
Al2O36.55
P0.138
Size 0-10MM12.75
Size 10-20MM3.24
Size 20-100MM62.86
Size +100MM21.15
MOISTURE0.96