Supply Date19 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity37.86
Freight29.237
Loading Charges1.237
Offloading Charges-21.00396197
Royalty7.46
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6206.39
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.09
Fe3.26
SiO214.27
Al2O33.56
P0.124
Size 0-10MM5.10
Size 10-20MM1.95
Size 20-100MM58.70
Size +100MM34.25
MOISTURE0.86