Supply Date19 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity40.54
Freight460
Loading Charges29.29327992
Offloading Charges92.55
Royalty105.35866
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost4566.02
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.05
Fe2.84
SiO216.27
Al2O34.25
P0.135
Size 0-10MM3.15
Size 10-20MM3.74
Size 20-100MM76.39
Size +100MM16.72
MOISTURE0.98