Supply Date19 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity46.66
Freight26.47
Loading Charges1.237
Offloading Charges-20.99699957
Royalty7.44
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7519.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.02
Fe3.15
SiO214.05
Al2O34.28
P0.121
Size 0-10MM5.94
Size 10-20MM2.35
Size 20-100MM41.03
Size +100MM50.68
MOISTURE0.78