Raw Material Inward
| Supply Date | 19 Aug 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/08.01/2022 |
| Item | Manganese Ore |
| Supplier Name | AMIZO POWER ENGINEERS LTD |
| Grade (%) | High (44% - 50%) |
| Lot Number | AMIZO POWER ENGINEERS LTD-HG |
| Deviance | 0 |
| Inward Quantity | 39.94 |
| Freight | 26.47 |
| Loading Charges | 1.237 |
| Offloading Charges | -19.70706059 |
| Royalty | 7.44 |
| Other Cost | 1 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 6487.85 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |