Supply Date19 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity39.94
Freight26.47
Loading Charges1.237
Offloading Charges-19.70706059
Royalty7.44
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6487.85
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.15
Fe2.59
SiO213.82
Al2O33.72
P0.119
Size 0-10MM6.02
Size 10-20MM1.72
Size 20-100MM50.76
Size +100MM41.50
MOISTURE0.92