Supply Date18 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.03/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity52.92
Freight26.47
Loading Charges1.240023432
Offloading Charges-25
Royalty7.46
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost8529.12
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.10
Fe2.60
SiO213.66
Al2O33.90
P0.124
Size 0-10MM6.72
Size 10-20MM3.15
Size 20-100MM39.63
Size +100MM50.50
MOISTURE0.95