Supply Date17 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity33.66
Freight30.7995564863
Loading Charges2.722
Offloading Charges9.998514557
Royalty6.89
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5264.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.34
Fe3.85
SiO214.35
Al2O34.58
P0.142
Size 0-10MM3.75
Size 10-20MM3.24
Size 20-100MM76.19
Size +100MM16.82
MOISTURE1.68