Supply Date16 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity29.56
Freight350
Loading Charges-200
Offloading Charges0
Royalty106
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost3591.18
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.19
Fe2.81
SiO213.50
Al2O34.61
P0.160
Size 0-10MM2.81
Size 10-20MM3.95
Size 20-100MM62.63
Size +100MM30.61
MOISTURE0.90