Supply Date13 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameSIMON CHOMBA
Grade (%)High (44% - 50%)
Lot NumberSIMON CHOMBA - MN ORE
Deviance0
Inward Quantity45.82
Freight459.90922
Loading Charges0.184235705
Offloading Charges350
Royalty106.81972
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost6020.75
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.35
Fe7.1
SiO211.48
Al2O34.9
P0.121
Size 0-10MM7.7
Size 10-20MM5.9
Size 20-100MM51.2
Size +100MM35.2
MOISTURE1.1