Supply Date13 Aug 2022
Contract NumberSAFAL/P/MN ORE/08.01/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity26.92
Freight25
Loading Charges1.239970282
Offloading Charges-21
Royalty9.22
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4346.5
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.13
Fe2.58
SiO210.45
Al2O33.48
P0.098
Size 0-10MM0.85
Size 10-20MM1.02
Size 20-100MM15.40
Size +100MM82.73
MOISTURE0.74