Supply Date13 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity34.16
Freight30.7995564863
Loading Charges2.722
Offloading Charges9.957259953
Royalty6.58
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5330.97
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.34
Fe5.6
SiO214.1
Al2O34.1
P0.142
Size 0-10MM3.07
Size 10-20MM2.78
Size 20-100MM76.50
Size +100MM17.65
MOISTURE0.98