Supply Date10 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity39.06
Freight460
Loading Charges29.29185489
Offloading Charges92.55
Royalty112.17694
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost4415.73
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.40
Fe5.10
SiO213.20
Al2O33.27
P0.130
Size 0-10MM23.10
Size 10-20MM28.15
Size 20-100MM48.75
Size +100MM0
MOISTURE1.05