Supply Date08 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity35.16
Freight460
Loading Charges92.55
Offloading Charges29.29138111
Royalty105.521
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost3960.42
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.10
Fe2.66
SiO216.20
Al2O33.92
P0.130
Size 0-10MM2.20
Size 10-20MM2.50
Size 20-100MM79.20
Size +100MM16.10
MOISTURE0.99