Supply Date08 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity21.52
Freight350
Loading Charges-200
Offloading Charges0
Royalty110.23
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost2620.03
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.01
Fe3.30
SiO210.61
Al2O34.59
P0.168
Size 0-10MM1.12
Size 10-20MM1.50
Size 20-100MM61.78
Size +100MM35.60
MOISTURE0.95