Supply Date08 Aug 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity33.14
Freight460
Loading Charges29.29369946
Offloading Charges-313.3
Royalty112.17694
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost2917.98
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.10
Fe4.10
SiO220.81
Al2O32.93
P0.132
Size 0-10MM1.10
Size 10-20MM2.60
Size 20-100MM75.49
Size +100MM20.81
MOISTURE0.95