Supply Date08 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity33
Freight30.7995564863
Loading Charges2.722
Offloading Charges10.04848485
Royalty6.58
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5152.95
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.35
Fe4.10
SiO214.90
Al2O35.01
P0.138
Size 0-10MM2.90
Size 10-20MM6.15
Size 20-100MM80.24
Size +100MM10.66
MOISTURE0.80