Supply Date05 Aug 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity35.34
Freight619.12
Loading Charges310.42
Offloading Charges19.10963214
Royalty132.14
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost6306.57
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.10
Fe3.15
SiO211.95
Al2O34.19
P0.130
Size 0-10MM3.10
Size 10-20MM2.50
Size 20-100MM73.74
Size +100MM20.66
MOISTURE0.96