Supply Date03 Aug 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity22.74
Freight350
Loading Charges-300
Offloading Charges0
Royalty85.07
Other Cost16.234
Quality Deviance0
Grade Deviance0
Total Cost2593.24
Conversion Rate (Please insert 1 if no conversion is required)16.234
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.79
Fe3.63
SiO214.47
Al2O37.10
P0.120
Size 0-10MM10.95
Size 10-20MM4.70
Size 20-100MM73.83
Size +100MM10.52
MOISTURE2.45