Supply Date29 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity31.2
Freight338.71
Loading Charges0
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3063.23
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.9
Fe4.1
SiO213.2
Al2O36.85
P0.196
Size 0-10MM2.65
Size 10-20MM1.85
Size 20-100MM39.3
Size +100MM56.2
MOISTURE1.2