Supply Date27 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity30.62
Freight306.99
Loading Charges0
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost2949.33
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.94
Fe4.10
SiO212.85
Al2O35.35
P0.197
Size 0-10MM4.36
Size 10-20MM2.78
Size 20-100MM32.54
Size +100MM60.32
MOISTURE2.08