Supply Date27 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity24.88
Freight450
Loading Charges144.27
Offloading Charges-13.46988545
Royalty121.43
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3675.16
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.75
Fe5.68
SiO217.62
Al2O34.75
P0.132
Size 0-10MM0.72
Size 10-20MM0.94
Size 20-100MM51.12
Size +100MM47.22
MOISTURE0.68