Raw Material Inward
| Supply Date | 27 Jul 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/01.09/2022 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Ltd- Mn Ore |
| Deviance | 0 |
| Inward Quantity | 25.48 |
| Freight | 450 |
| Loading Charges | 144.27 |
| Offloading Charges | -71.41279239 |
| Royalty | 124.33 |
| Other Cost | 17.055 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3681.55 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.055 |
| Inward Status | Rejected |