Supply Date27 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity37.18
Freight341.1
Loading Charges-2.394488973
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3650.33
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.65
Fe3.98
SiO211.84
Al2O35.84
P0.189
Size 0-10MM3.75
Size 10-20MM2.48
Size 20-100MM33.57
Size +100MM60.20
MOISTURE1.70