Supply Date26 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity34.98
Freight29.32
Loading Charges12.63
Offloading Charges0
Royalty7.05
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5421.9
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.55
Fe6.85
SiO214.35
Al2O34.84
P0.144
Size 0-10MM3.56
Size 10-20MM3.10
Size 20-100MM72.19
Size +100MM21.15
MOISTURE1.25