Supply Date26 Jul 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity23.76
Freight150
Loading Charges0
Offloading Charges0
Royalty119.04
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost2766.91
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.35
Fe8.75
SiO212.94
Al2O33.96
P0.169
Size 0-10MM1.24
Size 10-20MM1.85
Size 20-100MM44.81
Size +100MM52.10
MOISTURE1.52