Supply Date25 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity36.82
Freight260
Loading Charges0
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3445.07
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.10
Fe3.75
SiO212.97
Al2O36.10
P0.192
Size 0-10MM8.14
Size 10-20MM3.24
Size 20-100MM34.92
Size +100MM53.70
MOISTURE1.35