Supply Date23 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity35.16
Freight29.32
Loading Charges12.63
Offloading Charges0
Royalty7.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5452.61
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.78
Fe6.75
SiO213.97
Al2O34.20
P0.147
Size 0-10MM2.68
Size 10-20MM1.52
Size 20-100MM76.05
Size +100MM19.75
MOISTURE1.05