Supply Date23 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity34.92
Freight306.99
Loading Charges0
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3363.51
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.85
Fe3.92
SiO213.78
Al2O36.20
P0.192
Size 0-10MM7.94
Size 10-20MM3.05
Size 20-100MM35.95
Size +100MM53.06
MOISTURE1.25