Supply Date22 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity34.6
Freight511.65
Loading Charges417.15
Offloading Charges-11.53430636
Royalty154.35
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost5860.33
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.08
Fe3.75
SiO210.98
Al2O35.02
P0.26
Size 0-10MM1.35
Size 10-20MM1.70
Size 20-100MM77.85
Size +100MM19.10
MOISTURE1.92