Raw Material Inward
| Supply Date | 22 Jul 2022 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/07.01/2022 |
| Item | Manganese Ore |
| Supplier Name | PHILLIP KOSAMU |
| Grade (%) | Medium (38% - 44%) |
| Lot Number | PHILLIP KOSAMU MN ORE-38% -42% |
| Deviance | 0 |
| Inward Quantity | 46.28 |
| Freight | 341.1 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 118.7 |
| Other Cost | 17.055 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4550.27 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.055 |
| Inward Status | Accepted |