Supply Date21 Jul 2022
Contract NumberSAFAL/P/MN ORE/07.01/2022
ItemManganese Ore
Supplier NamePHILLIP KOSAMU
Grade (%)Medium (38% - 44%)
Lot NumberPHILLIP KOSAMU MN ORE-38% -42%
Deviance0
Inward Quantity35.68
Freight306.99
Loading Charges0
Offloading Charges0
Royalty118.7
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3436.71
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.65
Fe4.18
SiO214.94
Al2O35.96
P0.186
Size 0-10MM12.70
Size 10-20MM1.95
Size 20-100MM38.53
Size +100MM46.82
MOISTURE1.94