Supply Date21 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity37.72
Freight213.08
Loading Charges0
Offloading Charges-5.751314952
Royalty109.49
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3226.54
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.65
Fe4.05
SiO220.68
Al2O34.98
P0.134
Size 0-10MM2.15
Size 10-20MM1.65
Size 20-100MM83.60
Size +100MM12.60
MOISTURE1.02