Supply Date20 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity36.66
Freight460
Loading Charges173.71
Offloading Charges0
Royalty116.32
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost4067.07
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.85
Fe3.15
SiO219.10
Al2O35.26
P0.134
Size 0-10MM1.14
Size 10-20MM1.30
Size 20-100MM84.86
Size +100MM12.70
MOISTURE1.15