Supply Date19 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity31.62
Freight511.65
Loading Charges-11.21897533
Offloading Charges417.15
Royalty161.85
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost5370.09
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.19
Fe3.72
SiO210.40
Al2O33.48
P0.127
Size 0-10MM2.52
Size 10-20MM1.70
Size 20-100MM74.68
Size +100MM21.10
MOISTURE1.68