Supply Date12 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity35.4
Freight29.32
Loading Charges12.63
Offloading Charges0
Royalty7.28
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5495.14
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.21
Fe7.42
SiO213.48
Al2O33.94
P0.140
Size 0-10MM1.72
Size 10-20MM1.15
Size 20-100MM82.43
Size +100MM14.70
MOISTURE1.18