Supply Date11 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity35.44
Freight430
Loading Charges173.71
Offloading Charges-0.009624718
Royalty140.19
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3918.96
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.85
Fe6.35
SiO28.96
Al2O34.95
P0.136
Size 0-10MM26.80
Size 10-20MM68.92
Size 20-100MM4.28
Size +100MM0
MOISTURE2.08