Supply Date07 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity29.94
Freight430
Loading Charges173.71
Offloading Charges-0.011392786
Royalty117.51
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost3270.95
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.08
Fe2.95
SiO219.05
Al2O33.82
P0.132
Size 0-10MM1.75
Size 10-20MM1.20
Size 20-100MM85.57
Size +100MM11.48
MOISTURE0.84