SAFAL/P/MN ORE/03.26/2020
| Contract Number | SAFAL/P/MN ORE/03.26/2020 |
| Contract Date | 01 Mar 2020 |
| Type | Purchase |
| Supplier Name | Peniel Mines Limited |
| Description of Goods | Manganese Ore |
| Grade | Ultra Low (Below 32%) |
| Size | 10- 60 MM (90%Min) |
| Specifications | Mn- Min 28% |
| Quantity | 182 |
| Weight Unit | Metric Tonne |
| Destination | SAFAL, Kanona |
| Rate | 150 |
| Currency | Zambian Kwacha |
| VAT % | 16 |
| Mode/Terms of Payment | 100% after dispatch and testing at SAFAL lab |
| Terms of Delivery | Ex Mine loaded on trucks with documents - MRT INCLUSIVE |
| Delivery Period | March 2020 |
| Dispatch Through | Buyer hired trucks |
| Lot Number | Peniel Mining Mn Ore <30% |
| Remark | |
| Other Reference(s) | |
|---|
Showing 1-1 of 1 item.
| # | Supply Date | Supplier Name | Item | Grade (%) | Inward Quantity |
| 1 | 21 Mar 2020 | Peniel Mines Limited | Manganese Ore | Ultra Low (Below 32%) | 181.195 |
Total Supply: 181.2