Supply Date05 Jul 2022
Contract NumberSAFAL/P/MN ORE/01.09/2022
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Ltd- Mn Ore
Deviance0
Inward Quantity48.42
Freight450
Loading Charges195.44
Offloading Charges-23.98337361
Royalty129.96
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost7292.02
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.20
Fe3.6
SiO214.50
Al2O33.5
P0.11
Size 0-10MM3.6
Size 10-20MM6.12
Size 20-100MM60.18
Size +100MM30.1
MOISTURE1.2