Supply Date04 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity35.18
Freight430
Loading Charges173.71
Offloading Charges-0.0193917
Royalty122.97
Other Cost17.055
Quality Deviance(not set)
Grade Deviance0
Total Cost3854.67
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.02
Fe6.92
SiO210.99
Al2O35.68
P0.132
Size 0-10MM45.20
Size 10-20MM13.25
Size 20-100MM37.20
Size +100MM4.35
MOISTURE2.75