Supply Date01 Jul 2022
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity37.72
Freight430
Loading Charges429.42
Offloading Charges0.094950954
Royalty147.53
Other Cost17.055
Quality Deviance0
Grade Deviance0
Total Cost4753.1
Conversion Rate (Please insert 1 if no conversion is required)17.055
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.02
Fe3.17
SiO213.28
Al2O34.20
P0.120
Size 0-10MM1.75
Size 10-20MM0.90
Size 20-100MM77.25
Size +100MM20.10
MOISTURE1.78