Raw Material Inward
| Supply Date | 29 Jun 2022 |
|---|---|
| Contract Number | SAFAL/MN ORE/ 06.01/2022 |
| Item | Manganese Ore |
| Supplier Name | JUDITH BWALYA KABENDE |
| Grade (%) | High (44% - 50%) |
| Lot Number | Judith Bwalya - Mn Ore |
| Deviance | 0 |
| Inward Quantity | 21 |
| Freight | 350 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 160.69 |
| Other Cost | 17.004 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 2751.21 |
| Conversion Rate (Please insert 1 if no conversion is required) | 17.004 |
| Inward Status | Accepted |