Supply Date29 Jun 2022
Contract NumberSAFAL/MN ORE/ 06.01/2022
ItemManganese Ore
Supplier NameJUDITH BWALYA KABENDE
Grade (%)High (44% - 50%)
Lot NumberJudith Bwalya - Mn Ore
Deviance0
Inward Quantity21
Freight350
Loading Charges0
Offloading Charges0
Royalty160.69
Other Cost17.004
Quality Deviance0
Grade Deviance0
Total Cost2751.21
Conversion Rate (Please insert 1 if no conversion is required)17.004
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.02
Fe3.45
SiO211.25
Al2O34.59
P0.118
Size 0-10MM1.14
Size 10-20MM1.02
Size 20-100MM81.60
Size +100MM16.24
MOISTURE1.49